Two-position switch mounting direction

Aviation Mechanic Powerplant (AMP) practice question 9 of 13 on Engine Electrical Systems. ACS element AM.III.F.K10 · difficulty: recall. Want to answer it in a timed quiz? Use the Aviation Mechanic Powerplant (AMP) practice mode.

Question bank updated 2026-09-22

QUESTIONHow should a two-position on-off switch be mounted in an aircraft?

  1. ASo the on position is reached by a downward pull.
  2. BSo the on position is reached by an upward movement.
  3. CSo the toggle moves left to right to turn the switch on.
Show the answer and explanation

Correct answer: B. So the on position is reached by an upward movement.

  • A — incorrect Downward movement to turn a circuit on is the reverse of the recommended installation and is the kind of inconsistency that invites hazardous errors in switch operation.
  • B — correct The handbook states that two-position on-off switches should be mounted so that the on position is reached by an upward or forward movement of the toggle.
  • C — incorrect Sideways motion is not the convention given; the recommendation names upward or forward toggle movement for the on position.

BACKGROUND

Hazardous errors in switch operation are avoided by logical and consistent installation. Two-position on-off switches should be mounted so that the on position is reached by an upward or forward movement of the toggle. When the switch controls a movable aircraft element such as landing gear or flaps, the toggle should move in the same direction as the desired motion. Inadvertent operation of a switch can be prevented by mounting a suitable guard over it. A specifically designed switch should be used in any circuit in which a switch malfunction would be hazardous.

STUDY TIP

Keep two conventions straight: on is up or forward, and a switch controlling gear or flaps moves the way you want the surface to move.

KEY POINTS

  • On is reached by moving the toggle up or forward.
  • Gear and flap switches move in the direction of the desired motion.
  • A guard over the switch prevents inadvertent operation.

SOURCES

  • amp-powerplant/ch04.txt "Switches"
Practice the Aviation Mechanic Powerplant (AMP) test →Timed 100-question exam, by ACS area, or review your misses. Free.
MORE ON ENGINE ELECTRICAL SYSTEMS

SkyDrill is not affiliated with the FAA. This is an original practice item based on FAA-H-8083-32B Aviation Maintenance Technician Handbook – Powerplant, and 14 CFR part 43. Regulations and handbooks are revised; confirm details against the current edition.